Join or Login
All Posts

  In some cases it is necessary to modify or adapt a certified sensor, controller or system. Either due to an discovered insecurity, new legislation or an extended product requirement. You might think that if you change something on a certified product,
aholleyn 12 days ago 0 59

Working with an excavator enables the operator to perform a wide-ranging list of tasks depending on the job. Each application demands different skills and corresponding working tools. When operating with XSite Pro, the operator has full flexibility when it
Alex_Wahlmann 14 days ago 0 59

  The Abu Hadriyah Road is an important highway in Saudi Arabia's Eastern Province. The highway runs from the United Arab Emirates' Batha' border crossing to Kuwait's border, passing near or through the cities of Khobar, Dammam, Qatif, Jubail, and Khafji o
erik-geis 27.12.2021 0 295

Taiwan is the latest country where MOBA AG has introduced their 3D XSite Excavator control system to support companies working more efficiently and more accurately, - saving money, time, and rework. Xsite allows your team to program every dig in 2D and 3D
Alex_Wahlmann 07.12.2021 0 800

At November 10-12, Kyiv has hosted the International Forum on Construction and Repair of Roads and Bridges AVTODOREXPO. The current 19th edition of the show was the largest in its history. It has covered an exhibition area of more than 10 thousand square m
erik-geis 22.11.2021 0 194

  In Jubail Kingdom of Saudi Arabia, a 3D Xsite PRO system were installed on a Hyundai 520CC Long Boom Excavator. The system is being used to Dredge a Trench for an outfall pipe that goes 1.5Km on the seabed.       The system consists of multiple tilt sen
erik-geis 18.11.2021 0 850

Bastian Zeigner operates the family business in the second generation. He is one of the few drilling experts in Germany who specialized in Furukawa machines. In his career, he has delivered and set up more than 30 Drilling machines. In addition, Bastian Ze
Alex_Wahlmann 09.11.2021 0 660

Lessons-learned-Meeting A lessons learned meeting should never take place without preparation. In principle, any project member can prepare and carry out this. Most of the time, however, the project management does it. The basic framework for a lessons l
s_sehr 13.10.2021 0 253

The management of project teams in MOBA is a challenge because the project managers themselves do not have any direct access to the various resources required in each project. We have already taken a closer look at this special constellation in "coordinati
jung-roland 20.07.2021 0 478

Our team from MOBA INDIA has tested conventional compacting against compacting with MOBA MCA 500 compaction system with their customer L&T RATLAM MPEP PKG 22. Here is what they found out: Conventional Compacting would have led to 4-8 passes on aver
Alex_Wahlmann 29.06.2021 0 1878